AECOM and Geosyntec. 2020
Abstract:
Please note; Important information is contained in the file SummingRules_Readme_EPAR10.pdf. Compilation of EPA approved final PDI/Baseline sample planning documents from 2016 through 2020.
Files for this document are shown below. Click on the file name to download the file. The 'Search' box can be used to filter the list of files, and clicking on a column header will re-order the list.
Title | Filename | Size (kB) | Document Type |
---|---|---|---|
Portland Harbor Pre-Design Investigation and Baseline Sampling Summing Rules | SummingRules_Readme_EPAR10.pdf | 80 | Data File |
PROTOCOL MODIFICATION FORM | Attachment 1_Modification 01_Fish Tracking Study_5.4.18.pdf | 19 | Report Appendices |
Final Bathymetry Survey Field Sampling Plan | Bathymetry_FSP_FINAL_02.20.18.pdf | 5,163 | Report |
Final Data Quality Management Plan | DQMP_FINAL_02.20.18.pdf | 3,097 | Report |
Updated Surface Water and Sediment Trap Field Sampling Plan | FSP_SWST_Updated Final_09.27.18.pdf | 7,760 | Report |
Final Fish Tissue Field Sampling Plan | Fish Tissue_FSP_FINAL_rev. 08.20.18.pdf | 11,752 | Report |
Final Acoustic Fish Tracking Study Field Sampling Plan | Fish Tracking FSP_FINAL_033018.pdf | 8,759 | Report |
APPENDIX A SEDIMENT DATABASE DESCRIPTION FEASIBILITY STUDY | PH_RI-FS-Appendix-A_06.2016.pdf | 317 | Report Appendices |
Updated Final Porewater Field Sampling Plan | Porewater FSP_Rev4_FINAL_08.20.18.pdf | 13,617 | Report |
Final Quality Assurance Project Plan | QAPP_Final_12.19.19.pdf | 91,175 | Report |
Final Subsurface Sediment Coring Field Sampling Plan | SedCore_FSP_FINAL_07.12.18.pdf | 17,239 | Report |
Updated Final Surface Sediment Field Sampling Plan | SurfaceSed FSP_Rev.3_Updated Final_09.19.18.pdf | 16,584 | Report |